Valvoline
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Couldn't load pickup availability
Brand: Valvoline
Color: Gold
Features:
- Advanced protection against the four main causes of engine breakdown: wear friction heat and deposits
- Delivers 40% stronger wear protection than industry standards to reduce friction and improve fuel economy
- Provides 15% better deposit defense vs. industry standards, keeping engines cleaner for smoother performance and longer-lasting protection
- Up to 2.5X better heat protection vs. industry standards to fight harmful sludge formation and thermal breakdown
- Engineered for excellent low-temperature flow, reducing metal-to-metal contact during cold starts — when most engine wear typically occurs
- Meets the requirements of: ILSAC GF-7A, API SQ, API SP, API SN with SN PLUS, Resource Conserving and all preceding API and ILSAC gasoline categories. Additional Specifications: Ford WSS-M2C962-A1, Chrysler MS-13340, GM dexos 1 Gen 3
Release Date: 05-01-2021
model number: 881150-EA
Part Number: 881150
Details: Proven to maximize engine life, Valvoline Advanced Protection Full Synthetic 0W-20 Motor Oil delivers outstanding performance and durability you can count on. Formulated with high-quality synthetic base oils, it provides 40% stronger wear protection, 15% better deposit defense, and up to 2.5X better heat protection than industry standards. Advanced additive boosters minimize the effects of excessive heat and defend against damaging sludge to improve engine cleanliness. Its full synthetic formula flows easily during low temperatures to reduce wear at cold starts — when most engine damage occurs — and enhances fuel economy for more efficient performance. Valvoline Advanced Protection full synthetic formula not only improves fuel economy but also safeguards against the four major causes of engine breakdown: wear, friction, heat and deposits. Suitable for hybrid cars as well as most Toyota, Honda, Nissan Chevy, Ford, Dodge and more. For confidence and protection you can trust in all kinds of driving conditions, switch to Advanced Protection Full Synthetic motor oil. From Valvoline, the Original Motor Oil brand.
EAN: 0074130031777
Package Dimensions: 12.7 x 8.2 x 4.6 inches
Share
